www.xisp-inc.com

Don't wait for the future, help us build it!

User Tools

Site Tools


isdc_2015_space_solar_power

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
isdc_2015_space_solar_power [2015/02/06 03:18]
garybarnhard
isdc_2015_space_solar_power [2015/02/06 03:26]
garybarnhard
Line 19: Line 19:
     * 6 hours of track time on Thursday May 21st (with 2 x 20 mins breaks in addition to lunch).     * 6 hours of track time on Thursday May 21st (with 2 x 20 mins breaks in addition to lunch).
     * 6 hours on track time on Friday May 22nd (with 2 x 20 mins breaks in addition to lunch).     * 6 hours on track time on Friday May 22nd (with 2 x 20 mins breaks in addition to lunch).
- 
-== Thursday May 21, 2015 == 
- 
-== Friday May 22, 2015 == 
  
 ==== Space Solar Power Track Outline ==== ==== Space Solar Power Track Outline ====
  
-= Session 1 Concept Evolution: establishing and maintaining technical credibility = +=== Session 1 Concept Evolution: establishing and maintaining technical credibility === 
 +  * Narrative Description to be provided 
 + 
   - Slot #1 30 minutes including Q&A   - Slot #1 30 minutes including Q&A
   - Slot #2 30 minutes including Q&A   - Slot #2 30 minutes including Q&A
Line 32: Line 30:
   - Slot #4 30 minutes including Q&A   - Slot #4 30 minutes including Q&A
   - Panel 60 minutes including Q&A   - Panel 60 minutes including Q&A
-= Session 2 National Programs - what is being done and what is planned =+ 
 +=== Session 2 National Programs - what is being done and what is planned === 
 +  * Narrative Description to be provided  
   - Slot #1 30 minutes including Q&A   - Slot #1 30 minutes including Q&A
   - Slot #2 30 minutes including Q&A   - Slot #2 30 minutes including Q&A
Line 39: Line 39:
   - Panel 60 minutes including Q&A   - Panel 60 minutes including Q&A
  
-= Session 3 Applications - Commercial Stepping Stones to the future, drawing out real requirements for Space-to-Space, Space-to-Alternate Surfaces/Near Earth Objects, and Space-to-Earth applications.  +=== Session 3 Applications - Commercial Stepping Stones to the future===   
 +  * Drawing out real requirements for Space-to-Space, Space-to-Alternate Surfaces/Near Earth Objects, and Space-to-Earth applications.  
   - Slot #1 30 minutes including Q&A   - Slot #1 30 minutes including Q&A
   - Slot #2 30 minutes including Q&A   - Slot #2 30 minutes including Q&A
Line 46: Line 47:
   - Panel 60 minutes including Q&A   - Panel 60 minutes including Q&A
  
-= Session 4 Space Solar Power on the Moon: importance of and approaches to developing Space Solar Power energy resources on the Moon. **BONUS SESSION Incorporating Specific Lunar Content**  +=== Session 4 Space Solar Power on the Moon: === 
 +  * importance of and approaches to developing Space Solar Power energy resources on the Moon.  
 +//**NOTE THIS IS A BONUS SESSION Incorporating Specific Lunar Content to Coordinate with Lunar Workshop**//  
   - Slot #1 30 minutes including Q&A   - Slot #1 30 minutes including Q&A
   - Slot #2 30 minutes including Q&A   - Slot #2 30 minutes including Q&A
Line 53: Line 56:
   - Panel 60 minutes including Q&A   - Panel 60 minutes including Q&A
  
-= Session 5 SunSat competition 4 presentations & judge evaluations.+=== Session 5 SunSat competition 4 presentations & judge evaluations. ===
   - Slot #1 15 minutes including Q&A   - Slot #1 15 minutes including Q&A
   - Slot #2 15 minutes including Q&A   - Slot #2 15 minutes including Q&A
isdc_2015_space_solar_power.txt · Last modified: 2015/02/07 01:43 by garybarnhard